EV Charging
EV Charger Installation
A Level 2 home charger needs a dedicated circuit sized correctly for the charger and your panel's available capacity. We handle the electrical side so charging at home is fast, safe, and code-compliant.
What's included
- Level 2 home EV charger installation
- Dedicated circuit sizing for the charger and panel
- Panel capacity assessment before installation
- Permitting and inspection where required
- Charger placement and mounting
- Panel or service upgrades if capacity is short
Ready to get this scoped and scheduled?
Tell us about your project and we'll put together a written estimate — no pressure, no surprise add-ons.
Request an estimate
What we check before installing
Panel capacity
Whether your existing panel has room for the added load, or whether an upgrade is the real first step.
Circuit sizing
Matched to your specific charger's amperage — this isn't a one-size-fits-all installation.
Charger placement
Garage, driveway, or carport — wherever makes sense for your vehicle and daily routine.
Code requirements
Permit and inspection requirements vary; we handle that so the installation is documented correctly.
Common questions
Can my current panel handle an EV charger?
Sometimes — it depends on your panel's rated capacity and what else is already on it. We'll assess this before quoting the job.
How long does an EV charger installation take?
A straightforward install with an existing panel that has capacity is often a few hours. If a panel upgrade is needed first, that adds time.
Do you install chargers for any EV brand?
Yes — we install Level 2 chargers regardless of vehicle brand, as long as the charger itself is a standard hardwired or NEMA-plug unit.
Related services
Proudly serving
Helpful reading: Do I need a permit for electrical work in North Carolina?